Short answer. China has a legal duty of full guaranteed purchase: grid companies must buy, in full, the grid-connected output of compliant renewable projects, and a grid company that fails to do so and causes loss is liable for compensation, is ordered to correct and, if it refuses, faces a fine of up to one times the loss. But the duty has a defined scope. NDRC Order No. 15 (2024) splits output into guaranteed-purchase electricity and market-traded electricity, and excludes from the guarantee any shortfall caused by the generator itself, grid security constraints, grid maintenance, market bids or force majeure. Among the national texts retrieved, the one that spells out who pays for curtailment within the guaranteed volume is the 2016 Measures: crowding-out conventional units pay; the grid company pays for connection-line faults (except force majeure beyond design standards) and unplanned maintenance; and the project bears resource shortfalls and its own faults. Curtailed energy is measured under NEA's 2022 rules (mainly by the nacelle-wind-speed method) and disclosed monthly, with a dispute route. Provinces set utilisation targets, which regions with good resources may relax to, in principle, not below 90%; national wind utilisation was 94% in 2025 and 91.4% in the first quarter of 2026. Since Document 136 (2025) new-energy output in principle all enters the market, with a difference settlement outside the market for mechanism volumes. This guide explains how to read the layers.
1. The legal duty and its remedy
Article 14 of the Renewable Energy Law establishes the full guaranteed purchase system: grid companies must sign connection agreements with renewable generators built under the development plan and licensed or filed, and purchase in full the grid-connected output that meets connection standards within their coverage; generators must cooperate on grid safety. Article 29 makes a grid company that fails to purchase as required liable for the generator's economic loss, ordered to correct by the regulator, with a fine of up to one times the loss if it refuses.
Order No. 15 (in force 1 April 2024) repeats the liability at regulatory level and lists the triggering conduct: failing to build or complete connection works, refusing contracts, failing to provide connection service, failing to dispatch renewables with priority, or any other grid-, dispatch- or trading-caused shortfall. CNWattHub reading: the remedy is loss-based and fault-based. Curtailment ordered for a listed non-fault reason is not, on these texts, a compensable breach.
2. What is inside and outside the guarantee
Order No. 15 defines guaranteed-purchase electricity as the volume that market members must buy under the consumption-responsibility mechanism and share targets, and market-traded electricity as the volume priced through the market and bought by retailers and users. Article 6 then removes from the guaranteed scope any electricity affected by the generator's own causes, grid security constraints, grid maintenance, market bids or force majeure, and requires the grid, dispatch and trading bodies to record the specific cause and volume.
The record-keeping is where a wind owner's case is made or lost. Grid companies and generators must record unpurchased electricity (excluding self-consumption) and its causes, and dispatch and trading bodies must disclose to each generator, by the 8th of each month, the previous month's volumes and prices (guaranteed, market and temporary dispatch) and the unpurchased electricity with reasons.
3. The 2016 compensation mechanics
The 2016 NDRC Measures (发改能源〔2016〕625号) are, among the national texts retrieved, the one that allocates compensation. For curtailed regions they set guaranteed annual utilisation hours; within the guaranteed volume, curtailment caused by non-renewable generation crowding out consumption space or transmission capacity (not system-security causes) is treated as a transfer of the priority-generation contract to lower-priority units, which pay compensation in proportion to their effect, capped at the gap between the guaranteed volume and actual output. Curtailment from connection-line faults (except force majeure beyond design standards) or unplanned maintenance is compensated by the grid company; shortfalls from resource conditions or the project's own equipment faults and maintenance are borne by the project.
Administration: the trading centre, assisted by the grid company (the grid company is responsible where no trading centre exists), identifies the paying units (including captive plants) by ascending dispatch priority and in proportion to actual output; monthly statistics go to the NEA regional office and the provincial economic authority, allocations may be adjusted between months by actual generation and are settled annually; disputes may be coordinated by the NEA office with the provincial authority.
CNWattHub reading: these Measures are quoted as issued. None of the sources retrieved repeals them, but Order No. 15 (2024) and Document 136 (2025) post-date them and reorganise the guaranteed/market split, so read the 2016 text as the design the system grew from and check the current provincial settlement rules before relying on it.
4. How curtailed energy is measured
NEA's 2022 Measures on wind-farm utilisation statistics define curtailed electricity as electricity the farm could have generated but did not, after excluding its own faults, defects and maintenance; the main method is the nacelle-wind-speed method, with sample-turbine or met-mast extrapolation allowed by agreement with dispatch; curtailment periods follow dispatch instructions or AGC control periods, and both sides must record time, output limit and reason.
Utilisation is defined two ways — counting all curtailment causes (actual generation ÷ possible generation from available turbines) or only system-caused curtailment ((possible generation − system-caused curtailment) ÷ possible generation). Farms report monthly by the 5th; provincial grid companies report to the NEA office by the 15th and disclose results to farms; a farm that disputes the result asks dispatch to re-check and may then ask the NEA office to supervise.
| Step | Rule | Deadline / method |
|---|---|---|
| Define curtailed energy | Could have generated but did not, excluding own causes | Nacelle-wind-speed method (default) |
| Record the curtailment | Dispatch and farm both record time, limit, reason | Dispatch instruction or AGC period |
| Farm reports | Monthly generation information form | By the 5th |
| Grid company reports | Provincial monthly report to NEA office; disclosure | By the 15th |
| Dispute | Re-check with dispatch, then NEA office | — |
| Monthly disclosure to generator | Volumes, prices, unpurchased electricity and reasons | By the 8th |
5. Utilisation targets and the numbers
The Clean Energy Consumption Action Plan (2018–2020) set wind-utilisation targets of above 88% in 2018 (curtailment below 12%, striving for 10%), above 90% in 2019 (striving for about 92%; curtailment below 10%, striving for about 8%) and an internationally advanced level in 2020 (striving for about 95%; curtailment controlled at a reasonable level, striving for about 5%), and said that, in principle, for regions above 95% wind or PV utilisation, curtailed electricity would no longer be counted in national curtailment statistics. The plan has expired; it is cited here for how the utilisation and curtailment targets were defined.
NEA's 2024 notice lets provinces set new-energy utilisation targets after consumption analysis and allows regions with good resources to relax them, in principle to not below 90%, with annual dynamic assessment. National wind utilisation was 94% in 2025 (120 GW added; 1.13 trillion kWh generated) and 91.4% in the first quarter of 2026 (304.7 billion kWh, +0.4%; 15.77 GW added, 75% in the 'three north' regions). At its first-quarter 2026 press conference NEA said it is preparing a 2026 new-energy consumption work plan to safeguard stable consumption, especially in key western regions, and that planning aims to support reasonable consumption of more than 200 GW of new energy added per year.
CNWattHub arithmetic: 100% − 91.4% = 8.6 percentage points in the first quarter of 2026 and 100% − 94% = 6 points for the 2025 full year. The releases do not state which of the two 2022 utilisation formulas (all causes, or system causes only) the published rate uses, so these differences should not be read as a measured curtailment share without that confirmation.
6. What Document 136 and the market rules change
Document 136 (2025) moves new-energy output, in principle, entirely into the market with prices formed by trading, and creates an out-of-market difference settlement: for volumes in the mechanism, the grid company settles monthly the difference between the market average price and the mechanism price and charges it to local system operating costs. Separately, NEA's 2021 grid-connection operation rules make dispatch assess generators for unplanned outages, deviations from instructions and new-energy forecast deviations under local implementation rules, and require stations to run forecasting that meets national and industry standards.
CNWattHub reading: for a project whose output is market-traded, 'curtailment' increasingly shows up as unsold or low-priced energy and as deviation assessment rather than as a compensable shortfall in guaranteed hours. The Order No. 15 exclusion for 'market bids' is the hinge: energy not dispatched because of the project's own bid is outside the guarantee.
Reading table
| Question | Where to look | What you find |
|---|---|---|
| Is there a legal duty to buy my output? | Renewable Energy Law Art. 14 | Full guaranteed purchase of compliant grid-connected output |
| Remedy if the grid fails? | Art. 29; Order No. 15 Art. 20 | Compensation of loss; fine up to 1× loss if not corrected |
| Which curtailment is outside the guarantee? | Order No. 15 Art. 6 | Own causes, grid security, maintenance, market bids, force majeure |
| Who pays within the guaranteed volume? | 2016 Measures Art. 9–10 | Crowding-out units; grid company for connection-line faults (except force majeure beyond design standards) and unplanned maintenance |
| How is curtailed energy calculated? | 2022 statistics Measures | Nacelle-wind-speed method; dispatch records |
| Where do I see the monthly figures? | Order No. 15 Art. 17; 2022 Measures | Disclosure by the 8th / 15th; dispute route |
| What utilisation target applies? | NEA 2024 notice | Province sets; good-resource regions may relax, in principle not below 90% |
| What were recent national rates? | NEA releases | 94% (2025); 91.4% (Q1 2026) |
Checklist
CNWattHub editorial method, not a sourced rule:
- Obtain the monthly disclosure of unpurchased electricity and reasons, and reconcile it with the farm's own nacelle-wind-speed calculation.
- Classify each curtailment period by the Order No. 15 causes; under Order No. 15 a compensation claim rests on grid-, dispatch- or trading-body fault, while the 2016 Measures' crowding-out allocation applies, if at all, to the guaranteed volume.
- Check the provincial market rules for how curtailed market-traded energy and forecast deviations are settled; the 2016 allocation applies, if at all, to the guaranteed volume.
- Confirm the province's utilisation target and whether the project's region is above the floor.
- Keep dispatch instruction logs: compensation and dispute procedures rely on them.
- For financing models, use the NEA utilisation definitions and state which one (all causes or system-caused only).
Scope limits
One law (database copy), one NDRC order, two NDRC measures/plans (2016, 2018), two NEA rules (2021, 2022), two NEA notices and two NEA releases only. No provincial rule, compensation price, settlement statement or court decision is cited; the 2016 Measures are quoted as issued; the 2026 work plan was not retrieved. Not legal or investment advice.
Sources
- NPC Standing Committee, 中华人民共和国可再生能源法(2009修正)(MOFCOM database copy) — https://policy.mofcom.gov.cn/claw/clawContent.shtml?id=1240
- NDRC, 全额保障性收购可再生能源电量监管办法(国家发展改革委令第15号) — https://www.gov.cn/gongbao/2024/issue_11326/202405/content_6949616.html
- NDRC, 关于印发《可再生能源发电全额保障性收购管理办法》的通知(发改能源〔2016〕625号) — https://zfxxgk.ndrc.gov.cn/web/iteminfo.jsp?id=19721
- NDRC / NEA, 关于印发《清洁能源消纳行动计划(2018-2020年)》的通知(发改能源规〔2018〕1575号) (notice page) — https://zfxxgk.ndrc.gov.cn/web/iteminfo.jsp?id=15797
- NDRC / NEA, 清洁能源消纳行动计划(2018-2020年)(PDF, Guizhou Energy Administration copy) — https://nyj.guizhou.gov.cn/zwgk/xxgkml/zdlyxx/ghjh_33324/201812/W020181224607012953974.pdf
- NEA, 关于印发《风电场利用率监测统计管理办法》的通知(国能发新能规〔2022〕49号) — http://zfxxgk.nea.gov.cn/2022-04/26/c_1310587756.htm
- NEA, 关于做好新能源消纳工作保障新能源高质量发展的通知(国能发电力〔2024〕44号) — http://zfxxgk.nea.gov.cn/2024-05/28/c_1310777105.htm
- NEA, 2025年可再生能源并网运行情况 (2026-02-12) — https://www.nea.gov.cn/20260212/742b8c6a078347b0b39de676c05c5d58/c.html
- NEA, 国家能源局新闻发布会文字实录 (2026-04-27) — https://www.nea.gov.cn/20260427/09f3dbc015664a74b9cbe2444c4891bf/c.html
- NDRC / NEA, 关于深化新能源上网电价市场化改革促进新能源高质量发展的通知(发改价格〔2025〕136号) — https://www.gov.cn/zhengce/zhengceku/202502/content_7002959.htm
- NEA, 关于印发《电力并网运行管理规定》的通知(国能发监管规〔2021〕60号) (notice page) — https://zfxxgk.nea.gov.cn/2021-12/21/c_1310391369.htm
- NEA, 电力并网运行管理规定 (attachment, .doc) — https://zfxxgk.nea.gov.cn/1310391369_16427489148551n.doc
Every factual statement above was checked against the listed primary sources (independent review 2026-10-24). Sentences marked “editorial method” are CNWattHub analysis, not sourced facts. One law (database copy), one NDRC order, the 2016 NDRC measures (quoted as issued), the expired 2018–2020 action plan, two NEA rules, two NEA notices and two NEA releases only; no provincial rule, compensation price, settlement statement or court decision is cited. Not legal or investment advice.