How to Read China's Electricity Market Capacity and Balance: the Reserve Rules (2–5% Load Reserve, ~10% Contingency Reserve), the Four-Grade Supply-Gap Warning (Red at a Gap of at Least 20%), Capacity Trading and Reliable-Capacity Compensation in the 2024–2026 Texts, Demand Response as a Balancing Resource, and the 2025–2026 Peak-Load Numbers (1.553 Billion kW; No Demand Response or Orderly Power Use Reported to 30 July 2026)
- Published:
- Updated:
- Sources fact-checked:
- (12 sourced statements)
Short answer. "Capacity and balance" in China's texts is three questions with three different owners. (1) Adequacy is a planning rule: the 2022 interim reliability measures set load reserve at 2–5% of maximum generation load and contingency reserve at about 10%, with load reserve to be raised appropriately where imported power, new energy or non-interruptible users weigh heavily. (2) Balance in operation is a load-management rule: the 2023 measures define load management as regulating load by economic, administrative and technical means, including demand response and orderly power use, grade a supply gap red, orange, yellow or blue by its share of maximum demand (at least 20%; 10% to below 20%; 5% to below 10%; below 5%), and require any orderly-use plan to arrange the balance in the order staggered peaks, then peak avoidance, then curtailment. (3) Capacity as a market product is newer and still being built: the 2024 basic rules define capacity trading as the reliable output capability that supports maximum load and say capacity compensation and capacity markets will be explored; the 2025 spot-market guideline asks for study of a reliable-capacity compensation mechanism and exploration of an assessment that would score each unit type and new-type storage by its contribution to adequacy; and the 2026 capacity-price notice says that once spot markets run continuously a reliable-capacity compensation mechanism will pay units by peaking capability. The numbers to read against these rules: national load set three records from early July 2026, peaking at 1.553 billion kW, no province had used demand response or orderly power use as of the regulator's 30 July briefing, and the regulator said a further rise to about 1.6 billion kW could be met with supply and demand in overall balance; CEC's forecast for 2026 is a dispatched maximum load of 1.57–1.63 billion kW on 10.9–11 trillion kWh of consumption. This guide reads the rules and the regulator's figures; it quotes no provincial adequacy study or reserve calculation.
1. Adequacy: what the reserve rule says
| Rule | Text |
|---|---|
| Load reserve | 2–5% of maximum generation load (2022 interim measures) |
| Contingency (accident) reserve | about 10% of maximum generation load |
| Where to raise load reserve | areas with a high share of power from outside the region, new-energy generation or non-interruptible users |
| Black start | each black-start zone must have 1–2 units with black-start capability and sufficient capacity |
| Supply reliability actually delivered | 2024 national average supply reliability rate 99.924%; 6.71 hours and 2.12 outages per customer; urban grid 99.977%, rural grid 99.915% |
CNWattHub reading: the reserve percentages are planning margins on maximum generation load, set by the reliability regulation rather than by any market; the rule sets each reserve as a share of maximum generation load, so a provincial balance sheet should state that base and the reserve it carries on it. Whether installed capacity can actually be counted on at the peak is a separate question, which the reserve rule does not answer and the newer "reliable capacity" texts address.
2. Balance in operation: demand response, orderly use and the warning grades
- Definitions. Load management covers demand response and orderly power use, using economic, administrative and technical means to regulate, control and optimise load for grid security, orderly supply, renewable integration and efficiency. Demand response is voluntary adjustment of consumption, mainly through economic incentives, in response to short-term supply tightness or renewable-integration difficulty.
- Order of measures. Annual orderly-use plans must arrange the power and energy balance in the order staggered peaks first, then peak avoidance, then curtailment; curtailment may not be misused, and undifferentiated orderly use may not be imposed in the name of energy-saving targets.
- Warning grades. Provincial grid companies must track supply and demand and report an expected gap; warnings are issued in four grades by the share of the power or energy gap in current maximum demand — Grade I red at a gap of at least 20%, Grade II orange from 10% to below 20%, Grade III yellow from 5% to below 10%, Grade IV blue below 5%. Plans are revised before each summer and winter peak and drilled once before each.
- Demand side into the balance. The 2023 demand-side measures support qualifying demand-response resources taking part in capacity market trading or being brought into capacity compensation, and call for demand-side resources to be brought into the power balance step by step through virtual power plants and similar forms. The 2024–2027 action plan targets demand-side response capability of 5% or more of maximum load in typical areas and pushes qualifying typical areas towards about 10%.
CNWattHub reading: a warning grade is a ratio of gap to maximum demand, so a yellow warning at a 5% gap in a province with a 100 GW peak is a 5 GW shortfall; the order of measures puts staggered peaks first, peak avoidance second and curtailment last; and the regulator reported that as of 30 July 2026 no province had used demand response or orderly power use.
3. Capacity as a market product: three texts in sequence
| Text | What it establishes |
|---|---|
| 2024 basic rules (Art. 13) | capacity trading = reliable output capability supporting maximum load over a future period, from generating units, storage and others; a market-based capacity cost recovery mechanism to be built gradually, exploring capacity compensation and capacity markets |
| 2025 spot-market guideline (Section 四, "study the establishment of…") | explore a reliable-capacity assessment weighing unit type, output characteristics, auxiliary power rate and maintenance outages, giving a capacity factor for each unit type and for new-type storage; study compensation set by provincial price authorities, by local market maturity, on the principle of basically recovering the marginal unit's fixed cost; bidding where conditions allow, capacity markets when conditions mature |
| 2026 capacity-price notice (Section 一) + Q&A | after spot markets run continuously, reliable-capacity compensation pays units' reliable capacity by peaking capability under unified principles; reliable capacity = capacity a unit can supply continuously and stably at system peak, the 'yardstick' of peaking capability |
CNWattHub reading: the three texts move from a definition (2024), to a method still described as exploratory and to be studied (2025), to a trigger and a payment principle (2026). None of them publishes a national table of capacity factors by technology; a reader of a provincial document should look for whatever factor it assigns to wind, solar and storage and for the basis it cites, because the 2026 text pays reliable capacity by peaking capability, not nameplate.
4. The numbers: 2025–2026
| Indicator | Value | Source |
|---|---|---|
| 2025 consumption / installed capacity | 10.37 trillion kWh (+5.0%); 3.89 billion kW at end-2025 (+16.1%), of which 2.40 billion kW non-fossil | CEC release, Feb 2026 |
| 2026 forecast | 10.9–11 trillion kWh (+5–6%); dispatched maximum load 1.57–1.63 billion kW; >400 GW new capacity, >300 GW of it new energy; solar capacity to overtake coal for the first time | CEC release, Feb 2026 |
| Peak to 30 July 2026 | three records since early July, 1.553 billion kW, about 45 GW above the 2025 extreme | NEA, 30 Jul 2026 |
| Supply side added June 2025 → June 2026 | about 400 GW, of which 110 GW supporting and regulating (hydro, gas, coal); 46 UHV corridors; west-to-east capability >340 GW | NEA, 30 Jul 2026 |
| Demand-side tools used to 30 July 2026 | none — since the start of this summer peak period no province had used demand response or orderly power use | NEA, 30 Jul 2026 |
| Possible further peak | about 1.6 billion kW under wide persistent heat, with overall balance | NEA, 30 Jul 2026 |
| Summer 2025 market evidence | four load records; inter-provincial spot support to >20 provinces, >8 GW to Sichuan in July–August; Guangdong spot peak 1.293 yuan/kWh on 7 Jul 2025 with the coal fleet's unplanned-outage-and-constraint rate at 2.5%, a five-year low; Shanghai virtual power plant peak cut 1.16 GW | NEA, 31 Oct 2025 |
CNWattHub reading: the record to 30 July 2026 (1.553 billion kW) is below CEC's 1.57–1.63 billion kW forecast range for the year's dispatched maximum, while the regulator's conditional "about 1.6 billion kW" sits inside that range; the two numbers come from different bodies and the CEC figure is a forecast of the dispatched maximum, so they are comparable but not the same measurement. The 2025 evidence the regulator chose to report is market evidence — spot prices, inter-provincial trades and a virtual power plant — alongside demand-side management.
5. Where new energy fits: confident output
The 2024–2027 action plan runs nine special actions, among them building a batch of system-friendly new-energy plants that raise reliable output, with the aim of lifting new energy's confident output to 10% or more. CNWattHub reading: the 10% figure is a target for a batch of system-friendly plants, not a national conversion factor for all wind and solar nameplate; a reader of a provincial capacity balance should ask what share it assumes for wind and solar and what document that share rests on.
6. A reading sequence built from the sources
- Reserve. Compare the province's stated reserve with the 2–5% load and ~10% contingency rule and the raise-where-exposed clause.
- Reliable capacity. Find the capacity factor assumed per technology and the basis (2025 guideline method, 2026 notice trigger).
- Market product. Check whether the province has capacity trading, compensation or neither, against the 2024 definition.
- Demand side. Identify the demand-response capability (target 5% or more in typical areas, about 10% in qualifying ones) and whether it is counted in the balance or in capacity compensation.
- Warning record. Note any warning grade issued and the order of measures taken.
- Delivered reliability. Compare with the 2024 national rate of 99.924% and the urban/rural split.
- Peak evidence. Set the province's peak against the national record to 30 July 2026 and the 2026 forecast range.
Scope limits
This guide reads the 2024 basic rules, the 2022 interim reliability measures, the 2023 demand-side and load-management measures, the 2024–2027 action plan, the 2025 spot-market guideline, the 2026 capacity-price notice and Q&A, NEA's October 2025 and July 2026 press conferences, the 2024 reliability report and CEC's February 2026 release (read in a government republication; the cec.org.cn original could not be reached). It quotes no provincial adequacy study, reserve calculation, capacity-factor table or text after August 2026.
Sources
- NDRC Order No. 20, 电力市场运行基本规则 (2024), 国务院公报 — https://www.gov.cn/gongbao/2024/issue_11386/202406/content_6955758.html
- NDRC Order No. 50, 电力可靠性管理办法(暂行)(interim), 国务院公报 — https://www.gov.cn/gongbao/content/2022/content_5695043.htm
- NDRC et al., 电力需求侧管理办法(2023年版)(发改运行规〔2023〕1283号) — https://zfxxgk.ndrc.gov.cn/web/iteminfo.jsp?id=20274
- NDRC / NEA, 电力负荷管理办法(2023年版)(发改运行规〔2023〕1261号) — https://zfxxgk.ndrc.gov.cn/web/iteminfo.jsp?id=20275
- NDRC / NEA / NDA, 加快构建新型电力系统行动方案(2024—2027年)(发改能源〔2024〕1128号) — https://www.gov.cn/zhengce/zhengceku/202408/content_6966863.htm
- NDRC / NEA, 电力现货连续运行地区市场建设指引(发改能源〔2025〕1171号) — https://www.ndrc.gov.cn/xxgk/zcfb/tz/202509/t20250912_1400454_ext.html
- NDRC / NEA, 关于完善发电侧容量电价机制的通知(发改价格〔2026〕114号) — https://www.gov.cn/zhengce/zhengceku/202601/content_7056676.htm
- NDRC / NEA, 有关负责同志就完善发电侧容量电价机制答记者问 (2026-01-30) — https://www.ndrc.gov.cn/xxgk/jd/jd/202601/t20260130_1403520_ext.html
- NEA, 国家能源局举行新闻发布会 介绍市场化机制助力迎峰度夏电力保供任务完成情况 (2025-10-31) — https://www.nea.gov.cn/20251031/028f7c14e1e2469aad9478d1da8ed91f/c.html
- NEA, 国家能源局举行新闻发布会 介绍今年迎峰度夏电力供应保障有关情况 (2026-07-30) — https://www.nea.gov.cn/20260730/5f38453f2cdc475e93e663f0a8916ca0/c.html
- NEA / CEC, 2024年全国电力可靠性年度报告 — http://prpq.nea.gov.cn/uploads/file1/20250331/67ea4fb889529.pdf
- CEC release (Shandong DRC republication), 中电联发布2025-2026年度全国电力供需形势分析预测报告 (2026-02-02) — http://fgw.shandong.gov.cn/art/2026/3/10/art_91679_10484823.html
Every factual statement above was checked against the listed primary sources (independent review 2026-10-24). Sentences marked “editorial method” are CNWattHub analysis, not sourced facts. The 2024 basic rules, the 2022 reliability measures, the 2023 demand-side and load-management measures, the 2024–2027 action plan, the 2025 spot-market guideline, the 2026 capacity-price notice and Q&A, NEA's October 2025 and July 2026 press conferences, the 2024 reliability report and CEC's February 2026 release (read in a government republication) only; no provincial adequacy study, reserve calculation, capacity-factor table or text after August 2026 is quoted. Not legal, trading or investment advice.
Related companies
Reviewed company profiles in the CNWattHub database (Power). Listing is for navigation and is not an endorsement or a supplier ranking.