// CNWATTHUB STORAGE GUIDE
How to Assess a BESS Project Financial Model in China: the Revenue Lines the Rules Allow (Energy Arbitrage Under Spot or Agency Prices, Ancillary Services, the 2026 Grid-Side Independent Storage Capacity Price Scaled by Peaking Capability, Provincial Discharge Compensation), the Cost Lines (Charging Treated as a User, Grid-Loss and System-Operation Charges, 10-Year Minimum Tax Depreciation and the ≤5 Million Yuan Expensing Rule), and the Utilisation Evidence (611 → 911 → 1,195 Equivalent Hours, 2023–2025)
- Published:
- Updated:
- Sources fact-checked:
- (13 sourced statements)
Short answer. A storage model is only as good as the rule behind each line. On the revenue side the Chinese texts now allow four: (1) energy arbitrage — in areas where the spot market runs continuously, charging and discharging prices follow market rules or real-time spot prices; elsewhere charging is priced at the grid's agency purchase price for industrial and commercial users and the discharge price formation is set by the provincial price authority taking account of charge/discharge losses; (2) ancillary services, where independent storage shares or bears costs by its on-grid or off-grid energy in each settlement period, must bid if it already receives capacity payments, and is treated as a generator when discharging and a user when charging; (3) a capacity price that each province may grant (各地可给予) to listed grid-side independent storage that serves the safe operation of the power system and is not co-located (配储) storage, introduced at national level in January 2026 (whether and at what level it applies depends on the province's implementing document and project list) and set from the local coal-power capacity price scaled by peaking capability — full-power continuous discharge hours divided by the year's longest net-load peak duration, capped at 1 — and withdrawn once a reliable-capacity compensation mechanism exists; and (4) provincial compensation such as Inner Mongolia's 0.35 yuan/kWh of discharge for independent stations commissioned in or before 2025. On the cost side the same texts make charging a user transaction paying grid-loss and system-operation charges under a single-part transmission tariff, refunded for discharged energy, while the 2022 notice exempts charging energy corresponding to grid discharge from transmission tariffs and government funds; tax depreciation of machinery and production equipment runs at least 10 years, and only assets that qualify — products updated quickly because of technological progress, or year-round strong vibration or high corrosion — may shorten that to no less than 60% or use accelerated methods, with one-off expensing for items of 5 million yuan or less bought through 2027. The utilisation that drives arbitrage revenue is published: 611, 911 and 1,195 equivalent hours nationally in 2023, 2024 and 2025, and 573 and 626 hours in the two grid areas in the first half of 2026. This guide reads the rules and the regulator's numbers; it quotes no project's revenue, tariff spread, capex or IRR.
1. Revenue lines and the text behind each
| Line | Rule | What to check in the model |
|---|---|---|
| Energy arbitrage | spot real-time or market rules where spot runs continuously; agency I&C purchase price for charging elsewhere, discharge price formation set by the provincial price authority taking account of charge/discharge losses | which regime the province is in; whether the spread assumption matches that regime |
| Ancillary services | 2025 market rules: storage enterprises are participants; regulation, reserve and ramping defined; costs shared or borne by on-grid/off-grid energy; 2024 price notice: capacity-paid entities must bid; dual identity when charging and discharging; itemised bills | which products exist in the province; whether the model books both a capacity payment and ancillary revenue without the bidding duty |
| Capacity price (grid-side independent, listed) | provinces may grant it (各地可给予) to grid-side independent stations that serve the safe operation of the power system and are not co-located storage; coal capacity price × (full-power discharge hours ÷ longest net-load peak duration, ≤1), adjusted for market progress and system need; list drawn up by provincial energy and price authorities; ends when reliable-capacity compensation starts | whether the province has adopted it in a local implementing document; is the project on that province's list; system-security role and no co-located use; the duration ratio used; the end date assumed |
| Provincial compensation | e.g. Inner Mongolia 0.35 yuan/kWh of discharge for independent stations in the plan, commissioned in or before 2025; ~100 million yuan paid in May 2025 | eligibility window; whether a successor rate is assumed without a text |
| Co-located storage | 2025 reform forbids storage as a precondition for approval, connection or dispatch of new renewables | whether a 'mandated' revenue stream still exists for the project's province |
CNWattHub reading: the capacity-price arithmetic is a duration test. The notice scales the coal benchmark by full-power discharge hours over the longest net-load peak — a 2-hour station in a province whose peak lasts 4 hours cannot score more than half, and the cap of 1 means a long-duration station gains nothing above parity. The model should show the ratio, not a flat yuan/kW figure copied from coal. The Q&A's 165 yuan/kW·year (at least 50% of coal fixed cost) is a floor for coal, not a storage number, and a province that has not adopted the storage capacity price gives the line no basis at all.
2. Cost lines the rules impose
- Charging as a user. Under the 2026 notice, pumped storage and grid-side independent storage are treated as users when charging, pay grid-loss and system-operation charges, provisionally under a single-part transmission tariff, and are refunded transmission charges for the energy they discharge.
- The 2022 exemption. An independent station's charging energy corresponding to discharge to the grid does not bear transmission-distribution tariffs or government funds and surcharges.
- Ancillary cost sharing. Independent storage shares or bears ancillary-service costs by energy in each settlement period.
- Tax depreciation. Minimum 10 years for machinery and production equipment (20 for buildings, 3 for electronic equipment); shortened life no less than 60% of the minimum, or double-declining-balance or sum-of-years methods, but only for fixed assets that qualify under Art. 98 — those whose products are updated quickly because of technological progress, or that operate year-round under strong vibration or high corrosion. The regulation does not say which class a battery system falls in or that it qualifies; the model should state the class it uses and the basis for any accelerated method. Equipment and instruments with a unit value of 5 million yuan or less bought between 1 January 2024 and 31 December 2027 may be expensed in full in the year of purchase; higher-value items follow the regulation and the 2014/2015 accelerated-depreciation notices.
CNWattHub reading: a model that charges at the agency price but books discharge at spot in a province without continuous spot is mixing regimes; a model that applies the 2022 exemption and also pays full transmission charges on charging double-counts the cost; and a tax line that depreciates a battery over 10 years while the technical model augments at year 7 should say which governs the cash flow.
3. Utilisation: the regulator's numbers
| Indicator | Value | Source |
|---|---|---|
| Operating capacity, end-2025 | 136 GW / 351 GWh (+84% on end-2024); average duration 2.58 h | NEA, January 2026 |
| Equivalent utilisation hours | 611 (2023), 911 (2024), 1,195 (2025); 1,175 State Grid / 1,294 China Southern Grid in 2025 | NEA, January and July 2026 |
| Structure, end-2025 | independent storage 51.2% of cumulative capacity; 72% in projects ≥100 MW; 27.6% in stations ≥4 h | NEA, January 2026 |
| Operating capacity, end-June 2026 | 153 GW / 396 GWh (+61% y/y) | NEA, July 2026 |
| H1 2026 utilisation (grid-company statistics) | 573 h State Grid area (+9 h); 626 h China Southern Grid area (+41 h) | NEA, July 2026 |
CNWattHub reading: 1,195 equivalent hours in 2025 is a national average across all stations and all duties; a model's cycle count should be compared with the grid area's figure and with what the province's dispatch regime allows — the 2025–2027 action plan has non-spot areas add storage dispatch by merit order and spot areas dispatch by market results.
4. The policy direction
The 2025–2027 action plan targets more than 180 GW of new-type storage by 2027 with about 250 billion yuan of direct project investment, pushes storage into energy and ancillary markets (regulation, reserve, exploratory ramping and inertia products), and calls for improved capacity-price mechanisms, an orderly reliable-capacity compensation mechanism and market-formed charge/discharge prices. The 2022 notice sets the conditions under which a project registers as independent storage (independent metering and control, dispatch access, legal personality). The 2021 time-of-use notice sets the retail spread that behind-the-meter models rely on — peak-valley ratios in principle of at least 4:1 where the system peak-valley difference exceeds 40% and 3:1 elsewhere, with encouragement for industrial and commercial users to configure storage and dynamic adjustment of time bands with reference to spot signals.
CNWattHub reading: the direction of travel is from administered lines (capacity price, provincial compensation) to market lines (spot, ancillary, reliable-capacity compensation); the 2026 notice already writes the hand-over clause. A model whose value sits mostly in administered lines beyond the dates those texts name is carrying policy risk it should label.
5. The cost benchmark
Lazard's June 2025 LCOS v10.0 gives unsubsidised levelised cost of storage of $129–277/MWh for a 100 MW/2-hour and $115–254/MWh for a 100 MW/4-hour utility-scale standalone system and $319–506/MWh for a 1 MW/2-hour C&I system, and attributes the year's notable declines to cell oversupply and to higher cell capacity and energy density. CNWattHub reading: these are US-assumption ranges, useful for the shape of the cost stack and the direction of change, not for a Chinese project's capex; a Chinese model should carry its own quoted EPC price and cite it.
6. An assessment sequence built from the sources
CNWattHub's reading of the sources as a checklist:
- Regime. Continuous spot or not; charging price rule and discharge price rule accordingly.
- Registration. Independent storage conditions met; co-located storage not treated as mandated revenue.
- Capacity price. The province's implementing document actually grants it (the notice says provinces may); serves system security and not co-located storage; on that province's project list; duration ratio shown; end date when reliable-capacity compensation starts.
- Ancillary. Products available; bidding duty if capacity-paid; cost sharing by energy; itemised bill.
- Provincial compensation. Eligibility window and successor-rate assumption.
- Grid charges. User treatment when charging; refund on discharge; the 2022 exemption.
- Utilisation. Cycles versus 1,195 h national and the grid-area figures; dispatch regime.
- Tax. Asset class under Art. 60 (10-year minimum for production equipment); accelerated or shortened only if the asset qualifies under Art. 98 (fast technological renewal, or strong vibration/high corrosion), with the basis stated; ≤5 million yuan expensing through 2027.
- Retail spread (behind the meter). TOU ratios and dynamic adjustment.
- Cost sanity. Lazard's ranges for shape, own quotes for level.
Scope limits
This guide reads the 2025 pricing reform, the 2022 and 2026 NDRC/NEA notices and the 2026 Q&A, the 2025 ancillary-service rules and 2024 price notice, the 2021 time-of-use notice, the 2025–2027 action plan, NEA's January and July 2026 press conferences, Inner Mongolia's compensation report, the tax regulation and announcement, and Lazard's LCOS. It quotes no project revenue, spread, capex, IRR, provincial list, provincial capacity-price level or lease rate, and no text issued after July 2026.
Sources
- NDRC / NEA, 关于深化新能源上网电价市场化改革促进新能源高质量发展的通知(发改价格〔2025〕136号) — https://www.gov.cn/zhengce/zhengceku/202502/content_7002959.htm
- NDRC General Office / NEA General Department, 关于进一步推动新型储能参与电力市场和调度运用的通知(发改办运行〔2022〕475号) — http://zfxxgk.nea.gov.cn/2022-06/07/c_1310615910.htm
- NDRC / NEA, 关于完善发电侧容量电价机制的通知(发改价格〔2026〕114号) — https://www.gov.cn/zhengce/zhengceku/202601/content_7056676.htm
- NDRC / NEA, 有关负责同志就完善发电侧容量电价机制答记者问 (2026-01-30) — https://www.ndrc.gov.cn/xxgk/jd/jd/202601/t20260130_1403520_ext.html
- NDRC / NEA, 电力辅助服务市场基本规则(发改能源规〔2025〕411号), 国务院公报 — https://www.gov.cn/gongbao/2025/issue_12046/202505/content_7023967.html
- NDRC / NEA, 关于建立健全电力辅助服务市场价格机制的通知(发改价格〔2024〕196号) — https://www.gov.cn/zhengce/zhengceku/202402/content_6931026.htm
- NDRC, 关于进一步完善分时电价机制的通知(发改价格〔2021〕1093号) — https://www.gov.cn/zhengce/zhengceku/2021-07/29/content_5628297.htm
- NDRC / NEA, 新型储能规模化建设专项行动方案(2025—2027年)(发改能源〔2025〕1144号) — https://app.www.gov.cn/govdata/gov/202509/12/536503/article.html
- NEA, 国家能源局举行新闻发布会介绍2025年新型储能发展情况 (2026-01-30) — https://www.nea.gov.cn/20260130/50f657ce87f848e1a9a1861d1fd9aa23/c.html
- NEA, 国家能源局新闻发布会文字实录 (2026-07-30) — https://www.nea.gov.cn/20260730/3ce671c387574eeeb120fc3825be0399/c.html
- Inner Mongolia Energy Bureau (Xinhua report), 每度电0.35元,内蒙古储能容量补偿政策落地 (2025-06-12) — https://nyj.nmg.gov.cn/ywdt/nydt1/202506/t20250612_2738569.html
- State Council, 中华人民共和国企业所得税法实施条例(2024年修订), 国家行政法规库 — https://xzfg.moj.gov.cn/front/law/detail?LawID=1741
- MOF / STA, 关于设备、器具扣除有关企业所得税政策的公告(财政部 税务总局公告2023年第37号) — https://www.gov.cn/zhengce/zhengceku/202309/content_6902070.htm
- Lazard, LCOE+ (June 2025), Levelized Cost of Storage v10.0 — https://www.lazard.com/media/uounhon4/lazards-lcoeplus-june-2025.pdf
Every factual statement above was checked against the listed primary sources (independent review 2026-10-24). Sentences marked “editorial method” are CNWattHub analysis, not sourced facts. The 2025 pricing reform, the 2022 and 2026 NDRC/NEA notices and 2026 Q&A, the 2025 ancillary-service rules and 2024 price notice, the 2021 time-of-use notice, the 2025–2027 action plan, NEA's January and July 2026 press conferences, Inner Mongolia's compensation report, the tax regulation and announcement and Lazard's LCOS only; no project revenue, spread, capex, IRR, provincial list or provincial capacity-price level is quoted. Not financial, tax or investment advice.
Related companies
Reviewed company profiles in the CNWattHub database (Energy Storage). Listing is for navigation and is not an endorsement or a supplier ranking.