储能行业企业
本页列出 CNWattHub 企业库中源行业标签为「储能」、英文业务简介已对照公开披露完成审核的全部企业,共 35 家。企业页列出简介引用的来源与审核日期。行业标签沿用源记录,未经核验;审核仅覆盖业务简介。
- 已审核企业
- 35
- 行业标签(源记录)
- 储能
// 已审核企业
已审核企业
// 相关导读
相关导读(英文)
- How to Assess BESS Performance Guarantees: What Is Guaranteed (Capacity Threshold, Round-Trip Efficiency, Energy Performance), How It Is Measured (PNNL's Reference Performance Test at Beginning of Life and at Intervals in Time, Cycles or Throughput; Duty-Cycle RTE; Warranty Capacity Tests Under Each Vendor's Own Conditions — GoodWe at 25 °C and 0.2C Taking the Third Cycle, Sungrow at 25–28 °C With Model-Specific Currents), What Happens When It Is Missed (Fluence: Performance Liquidated Damages at Completion or Through the Service Term; Tesla: Guarantees It 'May' Give and Damages It 'May' Pay; Augmentation as Threshold-Maintenance or a Fixed Number of Top-Ups), Where the Clocks and Carve-Outs Are (Ten Years or a Throughput Whichever First; One Cycle a Day; Cells Only; 60% and 70% End Points; AC–AC Versus DC–DC Efficiency) and Who Stands Behind It (Parent Guarantees Paid for at Bank-Guarantee Cost Plus a Markup; a 15-Year Quality-and-Efficacy Insurance Policy Reported in the Press)
- How to Read China's Energy-Storage Safety Inspection Regime: the Four Checkpoints the National Notices Define (Feasibility-Stage Safety Analysis on File; Safety-Facility Check After Completion or Trial Operation; Qualified-Institution Grid-Connection Testing Before Acceptance, With 'No Connecting While Sick'; a Safety Post-Evaluation After a Period of Operation), the Continuous Layer (Power Enterprises' Monitoring of Batteries, BMS, EMS, PCS, Fire Systems and Cybersecurity at Generation- and Grid-Side Stations From 2025; Annual Full Fire-Facility Tests; Battery State-of-Health Checks; Reporting to the National Monitoring Platform), the Standards That Supply the Checklist (GB/T 42288-2022 Safety Code, GB/T 43868-2024 Start-Up and Acceptance, GB/T 42314/42312-2023 Hazard Identification and Emergency Plans, GB/T 46261-2025 Fire Monitoring, GB/T 51048-2025 Design) and What NEA Said in June 2026 About a Periodic Inspection Mechanism (Qualified Third-Party Evaluators 'Suitable' Rather Than Dispatch-Led, a Safety-Evaluation Guideline Being Drafted With Insulation, Capacity Retention and Efficiency Among Its Indicators, a 'Testing–Rating–Revenue' Link to Capacity Payments and Insurance Under Study)
- How to Assess BESS Availability Guarantees: the Definition Problem, Read Across From NREL's PV Framework (Time-Based Versus Energy Availability; Events Outside Management Control to Be Distinguished and Not Penalised; Block Versus Whole-System; Planned, Unplanned and Force-Majeure Categories in the IEC 63019 Specification Then Being Drafted), the Reference Documents (GB/T 36549-2018 Operation Indices for Electrochemical Storage Stations; IEC 62933-2-1 Unit Parameters and Tests), the Procurement Baseline (Sandia's Template: Five-Year Warranty, Life Expectancy for the Stated Discharge Profile, an 'Uptime Guarantee' Line Item), Who Carries the Risk in One Supplier's Own Disclosure (Tesla 10-K: Shortfall Risk, in Some Cases Including Third-Party Components), the Warranty Conditions to Read Beside It (Internet Access to Performance Data or No Claim; Ten Years or a Throughput, Whichever First) and the Grid Operator's Own Performance Assessment (Southern Region 2025: ±5% Energy Deviation Against a 96-Point Plan, 100% Dispatch-Telephone Availability Target, Exemptions Available for Grid Causes)
- How to Read China's Energy Storage Capacity Market: the First National Storage Capacity Price (发改价格〔2026〕114号 — Grid-Side Independent Storage Not Taking Part in 'Allocated' Storage; Local Coal Capacity Price × Discharge Hours ÷ Longest Net-Load Peak, Ratio Capped at 1; List-Managed), the Coal Benchmark It Scales From (330 Yuan/kW·Year Fixed Cost, ≥50% Recovered From 2026 = 165 Yuan/kW·Year), the Reliable-Capacity Compensation to Be Built in Due Course After Spot Runs Continuously, and Three Provincial Instruments — Xinjiang (Peak Duration Provisionally 6 Hours; Effective 1 June 2026), Gansu (Trial Compensation Issued Before 114号: 330 Yuan/kW·Year × Declared Capacity × Supply–Demand Coefficient From 1 January 2026, 50%/100% Monthly Cuts for Non-Delivery, Trial to End-2027) and Inner Mongolia (0.35 Yuan/kWh on Discharged Energy for Projects Commissioned by 2025, per Xinhua)
// 相关周研报
相关周研报
// 其他行业