电力行业企业
本页列出 CNWattHub 企业库中源行业标签为「电力」、英文业务简介已对照公开披露完成审核的全部企业,共 37 家。企业页列出简介引用的来源与审核日期。行业标签沿用源记录,未经核验;审核仅覆盖业务简介。
- 已审核企业
- 37
- 行业标签(源记录)
- 电力
// 已审核企业
已审核企业
// 相关导读
相关导读(英文)
- How to Read China's Electricity-Market Trading Credit Support: the Three Instruments the National Rules Name (Performance Guarantee Letter, Security Deposit, 'Other Settlement Collateral'; Performance Insurance in the Spot Rules), Who Lodges Them (Retailers and New Business Entities), How They Are Drawn (Spot Rules Article 103: Default Notice → Grid Applies → Trading Institution Claims on the Issuer → Suspension and Credit Record; Settlement Rules: Ten Working Days After Invoice for Retailers Without Distribution-Network Operating Rights), How They Cap a Bidder (Bid-Volume Limits Set by Assets, Guarantee Amount and Users' History; Jiangxi's Trial Rule Cancels Eligibility for Non-Lodgement After a Written Reminder), and How the 2026 Draft National Credit Guideline 'May' Scale Them (A-Grade: Amount 'Appropriately' Lowered, Forms Extended; C/D-Grade: Amount 'Appropriately' Raised, No Incremental Insurance; A–D Grades, in Principle Quarterly, From Public Credit, Audited Financials and Trading Conduct)
- How to Read China's Energy Storage Capacity Market: the First National Storage Capacity Price (发改价格〔2026〕114号 — Grid-Side Independent Storage Not Taking Part in 'Allocated' Storage; Local Coal Capacity Price × Discharge Hours ÷ Longest Net-Load Peak, Ratio Capped at 1; List-Managed), the Coal Benchmark It Scales From (330 Yuan/kW·Year Fixed Cost, ≥50% Recovered From 2026 = 165 Yuan/kW·Year), the Reliable-Capacity Compensation to Be Built in Due Course After Spot Runs Continuously, and Three Provincial Instruments — Xinjiang (Peak Duration Provisionally 6 Hours; Effective 1 June 2026), Gansu (Trial Compensation Issued Before 114号: 330 Yuan/kW·Year × Declared Capacity × Supply–Demand Coefficient From 1 January 2026, 50%/100% Monthly Cuts for Non-Delivery, Trial to End-2027) and Inner Mongolia (0.35 Yuan/kWh on Discharged Energy for Projects Commissioned by 2025, per Xinhua)
- How to Read China's Electricity Market Ancillary Service Fees: the Four Named Products and Their Fee Elements (Peak Regulation From Clearing Price With Awarded and Actual Output or Start-Stop Count; Frequency Regulation From Clearing Price × Mileage × Performance Coefficient, With the Coefficient in Principle Capped at 2 and the Mileage Price at 0.015 Yuan/kW; Reserve and Ramping From Awarded Capacity, Time and Price), Who Pays (In Principle No Pass-Through to Users Without a Continuously Running Spot Market; With One, Qualifying Frequency-Regulation and Reserve Fees Shared Between User Consumption and Non-Market Grid-Fed Energy in a Provincially Set Ratio; Independent Storage and VPPs Allocated on Grid-Fed or Grid-Drawn Energy), the Peak-Regulation Price Cap (In Principle the Local Grid-Parity New-Energy Tariff) and the Bill Rules (Balanced Budget, Each Product Listed Separately, Never Bundled; 'Daily Clearing, Monthly Settlement' Where Spot Runs Continuously) — With the Southern Region's 2025 Storage Rules as a Worked Regional Example
- How to Read China's Electricity Market Forecasting Services: Who Is Allowed to Forecast (the CMA's Unified Public-Forecast System; Other Departments' Observatories Limited to In-System Specialised Forecasts), What a Station Must Forecast (Medium-Term 240 h Before 9:00, Ultra-Short-Term Every 15 Minutes; Southern Region 2025 Accuracy Floors of 40/60/65% for Wind and 45/65/70% for PV, Assessed per Percentage Point at Installed Capacity × 0.2 or × 1 Hour × a Provincial Coefficient, Capped at 10 or 5 Hours a Month), What the Market Discloses (Load, Tie-Line, New-Energy and Hydro Forecasts Before Declarations Open), the 2026 CMA–NEA Targets (87%/89% 24-Hour Power-Forecast Accuracy; a Trading Meteorological Service Platform Under Task 11) and the Vendor Layer (One Listed Vendor's 4,345 Stations and >95% Renewal Rate, by Its Own Account)
// 相关周研报
相关周研报
// 其他行业